Trade Reallocator

RFG → DMO Roof-Removal Trade Change · WC Class Code 5551
● Live

The check

Two separate data points, per doctrine: the removal $/SQ and the squares removed. Don’t collapse them.

Why the trade change is real money

Xactimate prices roof tear-off under the roofing activity selector (RFG) using roofing-trade labor — labor that carries roofing’s workers’-compensation burden. But tear-off is demolition work. Per WC class code 5551, when the removal line prices above the state threshold, the labor should be reallocated to the demolition trade (DMO) to meet Xactimate guidelines — priced as what it is, not what it’s next to.

It cuts both ways, and that’s the point: a carrier estimate that prices tear-off as cheap demo labor while paying roofing-trade rates nowhere else is exposed by the same logic — that’s the workers’-comp audit rule the Sextant runs on every claim. Record whether the change was triggered and whether the carrier conceded it; the concession ledger is how arguments become evidence.

Thresholds are per-state. Texas = >$90/SQ (verified). Do not carry the $90 figure into other states — each state’s threshold gets supplied as it’s verified.

PART OF THE AZIMUTH SEXTANT AUDIT-RULE SET (RULE: ROOFING PROVISION VS. DEMO LABOR PRICING) · A PROPRIETARY METHODOLOGY OF AZIMUTH RISK GROUP, LLC. OUTPUT REQUIRES REVIEW BY A LICENSED PUBLIC ADJUSTER BEFORE USE IN NEGOTIATION.
An Azimuth Risk Group project · Disabled Veteran-Owned